Matters to Note When Inspecting Manual Hoists for Lifting Propellants

This is a notable content stipulated in Circular 128/2016/TT-BQP issued by the Ministry of National Defense on August 30, 2016.

Circular No. 128 stipulates that when conducting inspections of lifting hoists, the following conditions must be ensured:

- The lifting hoist must be ready for inspection;- The technical documentation of the lifting hoist must be complete;- Environmental and weather factors must be suitable and not affect the inspection results;- Inspection equipment and tools must be adequate and appropriate for the subject being inspected;- Safety and labor hygiene conditions must be met to inspect the lifting hoist.

See details Circular No. 128/2016/TT-BQP effective from October 15, 2016.

-Thao Uyen-

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: [email protected]
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;